Contact Victory Pool and Spa to schedule an appointment to get started on your pool project. All Victory pools and spas are built to your custom specifications. We listen to your vision of your pool project and make it come to life! We go the extra step of walking customers through the process of pool builds from start to finish so you will know what to anticipate from the initial dig to the opening of your brand new pool!
New Construction
Services
How long does it take to
Build A Pool
Step 1: Project Design
This 1st step is to work out what you're wanting out of a pool. You'll meet with one of our professional pool building contractors and discuss your landscape layout, pool dimensions, and positioning. After this meeting, your contractor can build a complete blueprint and the proposal with a price tag for you.
Step 2: Permits
Moving forward, your contractor will work to obtain the permits for utility, gas, and supplementary permits. This will ensure that all the plans for your new pool comply with local and state codes.
Step 3: Layout and Excavation
Once all plans and permits have been approved, the pool elevation can be set and lined out. After that, the excavation process can begin. During this process, the pool walls are trimmed back and the depth is dug in.
Step 4: Structure and Rough Plumbing
Next, the pool shell is reinforced with steel, and the rough planning is done. This includes the installation of the drains and skimmers.
Step 5: Pool Flooring and Tile
At this time, the pools concrete will be installed. At Victory pool and spa, our pools are shotcrete, a combination of sand and cement. Shotcrete pools have significant structural strength, so this shell is built to last
Once the shotcrete has been placed, you can choose tile and coping for your pool. There are many colors and textures that you can choose from to fit your personal style.
Step 6: Final Plumbing
The finalization of the plumbing for your pool will happen once the flooring and tile is complete, ensuring that your pool has quality circulation and filtration. Proper plumbing keeps the pool water clean all summer long, and all piping will be installed and tested at this time.
Step 7: Setting up Equipment and Electric
Your contractor will then set up the filtration equipment for the pool, including the water pumps. After that, it is time for an electrician to run the pool lights and the pool equipment power for the first time. The pool heater should also be run at this time if you have one. This will ensure that the electric is safe for everyday use.
Step 8: Deck Layout
Your pool’s deck can define the entire design of your landscape and pool area. Now that your pool’s filtration and electric are set up, it is safe for the deck to be installed. You can install a wood deck, but brick and concrete are also popular options.
Step 9: Cleaning Up and Finish
Now that the deck is completed, it is safe to clean up the construction site of all scrap materials. The pool interior is then coated with your choice of finish and can finally be filled with water.
Step 10: Start Up
Once your pool is full, a technician will come and check your pool and all equipment one final time. Once you are trained on everyday maintenance operations, your pool will be ready and safe to swim in. Victory Pool and Spa will make the pool building process easy and seamless for you. For more information on how we can help you with a new pool construction or remodeling project, contact us today.